The Project
Working in an SSSI location, the works consisted of the removal of old concrete pipe access bridge, and replacing with a new RC bridge with keyclamp railings and a concrete approach ramp.
Working in an SSSI location, the works consisted of the removal of old concrete pipe access bridge, and replacing with a new RC bridge with keyclamp railings and a concrete approach ramp.