The Project
Over 1km of footpath reconstruction works adjacent to the Bridgewater Canal, Manchester.
Works included excavation of the existing canal towpath and replacement with new tarmaccadam footpath incorporating new surface dressing.
Landscaping was also carried out together with fitting of decorative features including benches and handrails.
Footpath closures were required during the work period.